转换
强化学习
笔记本电脑
计算机科学
调度(生产过程)
作业车间调度
工厂(面向对象编程)
工业工程
生产线
运筹学
制造工程
人工智能
工程类
运营管理
地铁列车时刻表
电信
机械工程
传输(电信)
操作系统
程序设计语言
作者
Yi Fei Liang,Zan Sun,Tianheng Song,Qiang Chou,Wei Fan,Jianping Fan,Yong Rui,Qiping Zhou,Jessie Bai,Chun Li Yang,Peng Bai
出处
期刊:Interfaces
[Institute for Operations Research and the Management Sciences]
日期:2022-01-01
卷期号:52 (1): 56-68
被引量:25
标识
DOI:10.1287/inte.2021.1109
摘要
Lenovo Research teamed with members of the factory operations group at Lenovo’s largest laptop manufacturing facility, LCFC, to replace a manual production scheduling system with a decision-making platform built on a deep reinforcement learning architecture. The system schedules production orders at all LCFC’s 43 assembly manufacturing lines, balancing the relative priorities of production volume, changeover cost, and order fulfillment. The multiobjective optimization scheduling problem is solved using a deep reinforcement learning model. The approach combines high computing efficiency with a novel masking mechanism that enforces operational constraints to ensure that the machine-learning model does not waste time exploring infeasible solutions. The use of the new model transformed the production management process enabling a 20% reduction in the backlog of production orders and a 23% improvement in the fulfillment rate. It also reduced the entire scheduling process from six hours to 30 minutes while it retained multiobjective flexibility to allow LCFC to adjust quickly to changing objectives. The work led to increased revenue of US $1.91 billion in 2019 and US $2.69 billion in 2020 for LCFC. The methodology can be applied to other scenarios in the industry.
科研通智能强力驱动
Strongly Powered by AbleSci AI