调度(生产过程)
批处理
计算机科学
作业调度程序
作业车间调度
批量生产
数学优化
区间(图论)
并行计算
工程类
数学
运营管理
操作系统
地铁列车时刻表
云计算
组合数学
作者
Nita P.A Hidayat,Andi Cakravastia,T.M.A. Ari Samadhi,Abdul Hakim Halim
标识
DOI:10.1080/00207543.2015.1056322
摘要
This research addresses a batch scheduling problem for single item parts with multi due date on m heterogeneous batch processors. The objective is to minimise total actual flowtime of parts through the shop. The total actual flowtime of parts in a batch is the multiplication of the interval between batch arrival time and the due date by the number of parts in the batch. Using the actual flowtime as the objective means it is oriented to satisfy the due date as a commitment to customers, and simultaneously to minimise the length of time of the parts spending in the shop. An algorithm to solve this problem is proposed.
科研通智能强力驱动
Strongly Powered by AbleSci AI