Steve Bian,Haile Tsehayu,Renni Zhao,Josh Crossen
出处
期刊:Pipelines 2017
日期:2024-08-30
卷期号:: 292-301
标识
DOI:10.1061/9780784485569.032
摘要
The Northeast Boundary Trunk Sewer (NEBTS) was constructed between 1879 and 1894 and ranges from approximately 6 ft (1.8 m) to 23 ft (7 m) in diameter and is approximately 28,800 linear feet (LF) (8,778 m) in length. In 2018, DC Water commissioned a report on the condition of various sections of the sewer. Based on the results of the report, two sections/segments of the sewer required rehabilitation. Segment 1 has a circular cross section with a diameter of 22 ft (6.7 m). Segment 2 has a 9 ft (2.7 m) by 6 ft (1.8 m) wide egg-shaped cross section. DC Water tasked the Greeley and Hansen/Ramboll Joint Venture with analysis of rehabilitation alternatives. Once geopolymer was selected, the Joint Venture was tasked with a Finite Element Analysis to determine the thickness of the liner. Construction is anticipated to begin in Spring 2024 and finish in Summer 2025.
科研通智能强力驱动
Strongly Powered by AbleSci AI