Jing Sun,Jingru Li,Xuyang Wang,Yue Guo,Ruizhang Wang,Luchang Li,Haicheng Liu
出处
期刊:Energies
[Multidisciplinary Digital Publishing Institute]
日期:2026-11-19
卷期号:19 (22): 5605-5605
摘要
The rapid deployment of electric heavy-duty trucks (EHDTs) imposes coupled siting, sizing, and network reinforcement decisions on charging–swapping infrastructure, yet existing planning studies treat the distribution network, the on-site photovoltaic (PV) source, and the charging/swapping facilities as separate stages, which leads either to passive grid reinforcement or to under-utilized local resources. This paper proposes a grid–source–station–charger coordinated planning model (EH-GSSCC) for EHDT charging–swapping stations that integrates station allocation, on-site PV configuration, battery-swapping deployment, and distribution network expansion within a single mixed-integer linear program. On this basis, a holistic regional methodology is developed, combining a DBSCAN-based weighted clustering for demand estimation, a grid discretization plus multi-factor scoring procedure for candidate-site generation, and the coordinated model for the joint siting and sizing of stations, piles, PV units, swapping batteries, and network reinforcement. The case study with real data shows that the proposed method reduces the total cost by 10.2% relative to the ablated scheme without grid coordination, by 4.3% relative to the ablated scheme without PV, and by 31.4% relative to the charging-only scheme without battery swapping. A four-dimensional evaluation indicates that the proposed scheme attains high scores on cost economy, demand satisfaction, grid friendliness and PV consumption. The results verify the effectiveness of the coordinated grid–source–station–charger framework for regional EHDT infrastructure planning.
科研通智能强力驱动
Strongly Powered by AbleSci AI