助推器(火箭)
岩土工程
工程类
排水
土地复垦
生态学
生物
历史
航空航天工程
考古
作者
Yuanqiang Cai,Zhiwei Xie,Jun Wang,Peng Wang,Xueyu Geng
标识
DOI:10.1139/cgj-2017-0412
摘要
This paper presented a new approach for ground improvement of deep marine clay in which the conventional booster tube in the current air booster vacuum preloading technology was replaced by a booster prefabricated vertical drain (PVD). In comparison to the ordinary PVD, the booster PVD could provide inflow channels for the compressed air when the booster pump was in operation. To examine the performance of this new air booster vacuum preloading technology, in situ field tests were conducted at Oufei sluice project in Wenzhou, China, where the thickness of the soft soil layers (i.e., marine clay) was more than 20 m. An extensive monitoring system was implemented to measure the vacuum pressure, pore-water pressure, settlement, and lateral displacement at this reclamation site. With the collected field monitoring data, a comprehensive data analysis was carried out to evaluate the extent of ground improvement. The study results depicted that this new air booster vacuum preloading technology was more effective for the ground improvement of the deep marine clay layers, in comparison to the conventional vacuum preloading technology.
科研通智能强力驱动
Strongly Powered by AbleSci AI