Kyungki Kim,Yong K. Cho,Young Hoon Kwak
出处
期刊:
日期:2016-05-24
卷期号:: 2709-2718
被引量:8
标识
DOI:10.1061/9780784479827.270
摘要
The entire construction safety and productivity are greatly impacted by temporary structures. Despite the impacts, temporary structures are used in construction projects without sufficient planning efforts. As a result, there are widespread safety, productivity, constructability, and site coordination problems caused by temporary structures. Focusing on scaffolding, this research optimizes temporary structure plans using building information modeling (BIM). An optimization engine and a safety simulation engine were developed. The optimization engine generates multiple alternative scaffolding plans. The safety simulation engine simulates daily construction site conditions and automatically identifies potential safety hazards related to scaffolding. In a case study using a real world construction project, the optimization engine generated alternative scaffolding plans and the simulation engine successfully detected potential safety hazards. The construction and safety managers of a case study project could identify multiple scaffolding plans that were better than the original plan in terms of safety, cost, and duration. The overall results demonstrate that the proposed approach can assist in the creation of safer and more productive plans for scaffolding at a pre-construction stage.
科研通智能强力驱动
Strongly Powered by AbleSci AI