The design scheme of adding a separate pipeline end terminal( PLET) for two-phase subsea pipeline is introduced in this paper. The PLET is divided into two parts of the mud mat and WYE sled assembly which are calculated separately in design. The key links in the manufacture,test and installation of the mudmat and WYE sled assembly are described.