调度(生产过程)
计算机科学
生产(经济)
数学优化
作业车间调度
一体化生产
生产系统(计算机科学)
实时计算
分布(数学)
可靠性工程
生产经理
运筹学
配送中心
工业工程
供应链
分销管理系统
工程类
缩小
分布式计算
作者
Zhe Zhang,Xiaoling Song,Yong Yin,Taixin Li
标识
DOI:10.1080/00207543.2026.2718459
摘要
This paper addresses coordinated scheduling and distribution problems with self-operated logistics in seru production system (SPS), which is a notably innovative and efficient approach to respond quickly for current market demand fluctuations. Specifically, worker's learning effects and delivery time uncertainties, reflecting practical operational scenarios, are considered. Additionally, yatai type is concerned due to its sensitivity to learning effects and remarkable ability to tackle production volume fluctuations flexibly. A mixed integer programming (MIP) model is formulated with the objective of minimising the total time. The polyhedral structure of the model is analysed, and a specific class of valid inequalities is identified. Accordingly, an exact polyhedral-based cutting plane algorithm is designed, in which both upper bound and lower bounds are provided, and the simplex method and Branch and Bound (B&B) are employed to solve the linear programming (LP) relaxations. Computational studies are conducted on a set of random test experiments, and the results indicate that the proposed algorithm exhibits both efficiency and scalability in dealing with coordinated seru scheduling and distribution problems.
科研通智能强力驱动
Strongly Powered by AbleSci AI