拖延
迭代局部搜索
数学优化
整数规划
调度(生产过程)
作业车间调度
嵌套(过程)
计算机科学
迭代函数
到期日
元启发式
数学
工程类
机械工程
地铁列车时刻表
排队
程序设计语言
操作系统
数学分析
作者
Benedikt Zipfel,Janis S. Neufeld,Udo Buscher
标识
DOI:10.1080/00207543.2023.2167015
摘要
This paper studies the customer order scheduling problem in the context of additive manufacturing. The study discusses an integrated problem involving the nesting of parts as well as the scheduling of batches of nested parts onto unrelated parallel machines. A mixed-integer programming model is presented, based on existing formulations from the literature, that integrates different materials and sequence-dependent setup times. Additionally, a metaheuristic based on an iterated local search is proposed for the problem configuration under consideration. Focusing on minimizing the total weighted tardiness of orders, the efficiency of the heuristic approach is evaluated using comprehensive test data. Further, we show the importance of the considered order-related objective by using qualitative analysis.
科研通智能强力驱动
Strongly Powered by AbleSci AI