备品备件
风力发电
涡轮机
粒子群优化
可靠性工程
运筹学
可靠性(半导体)
供应链
缺货
维数之咒
计算机科学
业务规划
数学优化
工程类
运营管理
数学
功率(物理)
经济
业务
机械工程
物理
电气工程
管理
量子力学
营销
机器学习
作者
Bin Yan,Yifan Zhou,Mofan Zhang,Zhaojun Li
标识
DOI:10.1109/tr.2022.3178596
摘要
There are multiple warehouses in a multiechelon inventory system, and the size of the state space increases exponentially with the number of warehouses. Therefore, the curse of dimensionality becomes unavoidable when performing steady-state analysis. Most existing studies calculate the inventory cost or supply chain reliability based on specific assumptions. For example, it often assumes that the lead time is either zero or an integral multiple of the review period, and that each warehouse adopts a base-stock policy. This article considers a more practical and prevalent situation where the lead time is less than a review period, and a more general (s, S) strategy is adopted. The curse of dimensionality during steady-state analysis is alleviated by decomposing transition probabilities. Then, the cost and supply chain reliability are derived from steady-state distributions. Finally, a case study involving spare part inventory of wind turbines is considered. Nondominated inventory strategies are obtained using the particle swarm optimization method to strike a balance between costs for the wind turbine manufacturer and wind farm owners.
科研通智能强力驱动
Strongly Powered by AbleSci AI