连铸
生产(经济)
生产计划
整数规划
铸造
启发式
计算机科学
数学优化
过程(计算)
算法
连续生产
制造工程
工程类
数学
材料科学
冶金
经济
环境工程
操作系统
宏观经济学
作者
Minhu Lyu,Zheng Wang,Felix T.S. Chan
出处
期刊:
[Institute of Electrical and Electronics Engineers]
日期:2015-08-01
卷期号:: 1503-1508
被引量:3
标识
DOI:10.1109/coase.2015.7294312
摘要
In steel industry, production planning of continuous casting and hot rolling are connected closely with each other. In addition, they are constrained by many key factors such as due date, process routes, and production capacity. Therefore, it is necessary to solve the production planning problems for continuous casting and hot rolling in an integrated way. In this research, we model the integrated production planning problem for continuous casting and hot rolling by mixed integer programming with the objective of minimizing the setup time and maximizing the utilization of devices, based on which a heuristic algorithm is developed to solve the problem. Numerical experiments are conducted to evaluate the proposed algorithm based on the data acquired from a steel plant in Jiangsu Province, China, and the results show that the proposed algorithm works quite well in integrated production planning of continuous casting and hot rolling.
科研通智能强力驱动
Strongly Powered by AbleSci AI