可观测性
相量
计量单位
电力系统
冗余(工程)
水准点(测量)
母线
相量测量单元
工程类
控制理论(社会学)
计算机科学
可靠性工程
功率(物理)
数学优化
数学
电气工程
物理
大地测量学
量子力学
人工智能
地理
控制(管理)
应用数学
作者
Saikat Chakrabarti,Elias Kyriakides
标识
DOI:10.1109/tpwrs.2008.922621
摘要
This paper proposes a method for optimal placement of phasor measurement units (PMUs) for complete observability of a power system for normal operating conditions, as well as for single branch outages. A binary search algorithm is used to determine the minimum number of PMUs needed to make the system observable. In case of more than one solution, a strategy is proposed to select the solution resulting in the most preferred pattern of measurement redundancy. The proposed method is used to benchmark the optimal PMU placement solutions for the IEEE 14-bus, IEEE 24-bus, IEEE 30-bus and New England 39-bus test systems. The proposed method is applied on a 298-bus system to determine the optimal placement of PMUs when conventional measurements are available.
科研通智能强力驱动
Strongly Powered by AbleSci AI