塔架
大梁
变硬
结构工程
刚度(电磁)
刚度
工程类
跨度(工程)
最上等的
地质学
机械工程
纺纱
出处
期刊:Journal of the Structural Division
[American Society of Civil Engineers]
日期:1976-10-01
卷期号:102 (10): 1989-2003
被引量:6
标识
DOI:10.1061/jsdeag.0004455
摘要
In stayed girder bridges with two or three spans the horizontal displacement of pylon tops is prevented by the so-called fix-cables, i.e., upper end span cables. If stayed girder bridges are constructed with several equal main spans the intermediate pylons will tend to move horizontally under one-sided loading. This induces a rotation of the entire cable system giving unacceptable vertical deflections of the stiffening girder. To obtain the necessary stiffness two measures might be taken, either application of triangular pylon structures with sufficient horizontal rigidity at the top, or introduction of a horizontal fix-cable (tie) connecting all pylon tops.
科研通智能强力驱动
Strongly Powered by AbleSci AI