甲板
环氧树脂
材料科学
复合材料
腐蚀
沥青
桥面
粘结强度
结构工程
底漆(化妆品)
空隙(复合材料)
胶粘剂
工程类
图层(电子)
有机化学
化学
作者
Zhengxiong Chen,Wei Xu,Jian Zhao,Luming An,Feng Wang,Zizhan Du,Qiang Chen
出处
期刊:Buildings
[Multidisciplinary Digital Publishing Institute]
日期:2022-04-12
卷期号:12 (4): 477-477
被引量:13
标识
DOI:10.3390/buildings12040477
摘要
The bonding between pavement and a steel bridge deck is a key component affecting the structural integrity of steel deck pavement and delamination is a major cause. The bonding interface of steel deck pavement was systematically investigated to evaluate the interactive influences of factors, such as the air void of the asphalt concrete pavement, the surface roughness of the steel deck, the thickness of the zinc-rich epoxy primer, and the waterproof bonding membrane, on the bond strength of the pavement interface, through simulated loading, brine immersion, pull-off, and interface observation experiments. The results show that a low air void (<3.0%) was a necessary condition for the corrosion resistance and bonding reliability of the steel deck pavement structure, and a zinc-rich epoxy primer provided an additional guarantee for corrosion resistance of the steel deck pavement; additionally, the combination of steel deck plate roughness in the range of 120–140 μm and zinc-rich epoxy primer thickness in the range of 80–110 μm led to a high bond strength, which was also conducive to the corrosion resistance of the steel bridge plate. The steel deck pavement structure should be designed through combinatorial optimization of multiple factors to create an integrated waterproof and anticorrosion bonding system.
科研通智能强力驱动
Strongly Powered by AbleSci AI