计算机科学
调度(生产过程)
分布式计算
工业工程
工程类
运营管理
作者
Huagang Tong,Jianjun Zhu,Bin Wu,Zhenzhen Ma
标识
DOI:10.1016/j.aei.2024.102525
摘要
Shared Manufacturing (SM) seeks to efficiently utilize idle manufacturing capacity by matching it with demand. However, disruptions in the production process are common due to the open nature of the social environment. Therefore, rescheduling becomes crucial. First, previous rescheduling efforts have primarily focused on individual aspects, overlooking integrated multilevel rescheduling. To address this gap, we propose a multilevel complementary rescheduling model that considers manufacturing services, transportation, and bin-packing problems simultaneously. This approach significantly mitigates the impact of disturbances on production. Additionally, detecting disruptions during rescheduling is essential. However, existing real-time detection systems are often impractical due to high computing resource requirements and broadband constraints. To overcome this challenge, we introduce an information freshness-based approach, leveraging digital twin technology to optimize information collection frequency within resource limitations. Furthermore, previous rescheduling strategies have typically addressed single disturbances, neglecting interrelationships among disruptions. We introduce a global customer-oriented rescheduling rule that anticipates the combined effects of multiple disturbances using digital twin-based predictions. Finally, we propose enhancements to the artificial bee colony algorithm, incorporating a self-adjusting population and a solver-based local search method to optimize scheduling. A case study in SM validates the effectiveness of our proposed approach.
科研通智能强力驱动
Strongly Powered by AbleSci AI