运输工程
轨道交通
城市轨道交通
过境(卫星)
轻轨交通
工程类
城市铁路
法律工程学
业务
土木工程
公共交通
作者
Ratthaphong Meesit,Patraphorn Phornthepkasemsant,Rojjanast Rattanawan,Thitinan Ruamsab
标识
DOI:10.13189/cea.2022.100214
摘要
Railways are becoming the main transportation mode in Thailand. Thus, maintaining the optimal service level to passengers is one of the significant issues that need to be addressed. This makes the way to manage railway assets extremely important, especially with the essential assets on a railway network such as switches and crossings (S&C). This study presents how the risk of switch and crossing failures could be assessed and managed. The process of the risk management is based on ISO 31000, and the method used to analyse the risk is the Failure Modes, Effects and Criticality Analysis (FMECA). In detail, the switches and crossings on the Airport Rail Link city line (ARL), Thailand, are considered as a case study. The interview data from six experts, engineers and technicians who are responsible for the maintenance of S&C were used to determine the risk of each S&C component. The results show that the point machines, check and wing rails are the most critical components of S&C in the case study, and the least critical components are heel blocks, slide chairs and closure rails. Based on these findings, it is suggested that the current S&C maintenance program of the ARL may need to be improved. The priority of the inspection and maintenance activities of each S&C component could be adjusted according to the risk evaluation results presented in this study.
科研通智能强力驱动
Strongly Powered by AbleSci AI