数学优化
动态规划
非线性规划
功率(物理)
计算机科学
非线性系统
凸优化
最优化问题
正多边形
数学
几何学
量子力学
物理
作者
Nissan Levin,Asher Tishler,Jacob Zahavi
出处
期刊:Operations Research
[Institute for Operations Research and the Management Sciences]
日期:1983-10-01
卷期号:31 (5): 891-914
被引量:20
标识
DOI:10.1287/opre.31.5.891
摘要
We derive conditions under which the time-step, or the myopic, approach to generation capacity planning in the power industry yields solutions identical to the solution obtained by an equivalent dynamic model that views the capacity expansion program simultaneously over time. The conditions are derived for thermal power systems for which the capacity expansion program is formulated using a convex, nonlinear mathematical programming model.
科研通智能强力驱动
Strongly Powered by AbleSci AI