数学优化
计算机科学
帕累托原理
质量(理念)
模糊逻辑
运筹学
约束(计算机辅助设计)
能量(信号处理)
调度(生产过程)
项目管理
风险分析(工程)
可靠性工程
工程类
系统工程
人工智能
数学
哲学
认识论
统计
机械工程
医学
作者
Mohammad Hossein Haghighi,Seyed Meysam Mousavi,Mohsen Rajabzadeh
标识
DOI:10.1016/j.esr.2023.101189
摘要
To complete a successful energy project, all aspects and criteria which can influence the project should be considered. Classic time-cost trade-off (TCT) is used when the completion time of project is not acceptable for customers or top managers. This paper proposes a new cost-risk-quality-social consideration trade-off (CRQST) model for energy projects in a time-constrained problem for achieving specified due date under uncertainty. Moreover, a new comprehensive definition of risk criterion is proposed, and a novel approach for the quality criterion of project based on the dependence of the quality of activities with each other is presented. The internal and external environment of the energy project are considered simultaneously and a new criterion in TCT problem, called social consideration criterion, is introduced. A developed fuzzy augmented ε-constraint method is introduced for the presented multi-objective model to generate Pareto-optimal solutions. To depict the accuracy of results, the proposed model is solved by goal attainment method, and the results of two methods are compared. As a case study, a real oil and gas project is presented, and results show that the proposed method enables managers to effectively handle construction projects in real-world uncertain environments.
科研通智能强力驱动
Strongly Powered by AbleSci AI