灵活性(工程)
可再生能源
混合动力系统
模式(计算机接口)
投资回收期
航程(航空)
工艺工程
系统集成
汽车工程
电力系统
功率(物理)
煤
热电联产
过程(计算)
火力发电站
能源系统
发电站
过程集成
工程类
储能
能量(信号处理)
计算机科学
热的
控制工程
夹点分析
发电
混合动力
环境科学
热能
热能储存
负荷跟踪发电厂
能源
能量回收
燃煤
作者
Yuanjing Wang,Yanping Zhang
出处
期刊:National science open
[EDP Sciences]
日期:2026-02-04
卷期号:5 (4): 20250070-20250070
被引量:1
摘要
Under the large-scale integration of renewable energy, the power system becomes more volatile and uncertain, imposing higher demands on the flexibility of coal fired power plant (CFPP). In this study, a CFPP coupled with thermal energy storage (CFPP-TES) system is investigated. The main operating modes of the CFPP-TES system are defined, and its operating boundaries under different load levels are clarified. A bi-level optimization model of a virtual integrated energy system incorporating the thermodynamic features of the coupled system is developed for operation optimization. Results show that in the rapid-response mode, the coupled system achieves a peak regulation range of up to 82%Pe but with relatively low efficiency. By combining the rapid-response and steady-efficiency modes, a hybrid operation mode is formed, balancing flexibility and efficiency. In no-curtailment scenarios, the hybrid mode performs best, reducing the payback period to 2.35 years and showing strong adaptability.
科研通智能强力驱动
Strongly Powered by AbleSci AI