卤水
排水
石油工程
地质学
天然气田
环境科学
天然气
岩土工程
水文学(农业)
废物管理
化学
工程类
生态学
生物
有机化学
作者
Yi Zhang,Wei Huang,Xueqi Cen,Dandi Zhao,Guoxing Chai
出处
期刊:Journal of physics
[IOP Publishing]
日期:2022-06-01
卷期号:2280 (1): 012044-012044
标识
DOI:10.1088/1742-6596/2280/1/012044
摘要
Abstract Gas injection and brine discharge is the key link in the construction and safe operation of the salt cavern gas storage. Accurate description of the bottom flow field of the salt cavern in the process of gas injection and brine extraction is the basis and premise for determining the depth of the brine drainage string. According to the characteristics of gas injection and brine discharge, a numerical simulation calculation model of the brine flow field near the inlet of the brine discharge tubing was established. The brine flow field under different working conditions is simulated, and the safe brine drainage rate at different residual brine depths in the later stage of gas injection and brine drainage is determined, which provides technical support for the adjustment of gas injection brine drainage rate in the later stage of construction.
科研通智能强力驱动
Strongly Powered by AbleSci AI