Guangdong Tian,Wenjie Wang,Honghao Zhang,Xiangyu Zhou,Cheng Zhang,Zhiwu Li
标识
DOI:10.1016/j.eswa.2023.121309
摘要
Most previous studies on the scheduling problem in remanufacturing systems have focused on single or two production stages and economic criteria such as makespan or tardiness. However, environmental criteria like energy consumption or carbon emissions, as well as the lot-streaming production mode, have not been adequately addressed. This paper presents a novel approach to the energy-efficient remanufacturing system scheduling problem with lot-streaming production mode (ERSSP-LS) for the first time, which integrates disassembly, reprocessing, and reassembly three pivotal production stages. Firstly, a multi-objective mathematical model aimed at simultaneously minimizing the total energy consumption (TEC) and makespan (Cmax) is established and presented. To further reduce the TEC, the well-accepted energy-saving measure, known as the turn off and on strategy, is also integrated. Subsequently, a hybrid multi-objective optimization algorithm called HMOFFO, which combines the fruit fly optimization algorithm and simulated annealing mechanism is developed to seek the promising Pareto solution set. Finally, several experiments on a real-life case and a group of ten random test instances are carried out and the computational results affirm the feasibility and effectiveness of the proposed HMOFFO in solving the ERSSP-LS.
科研通智能强力驱动
Strongly Powered by AbleSci AI