可再生能源
沼气
地铁列车时刻表
太阳能
数学优化
风力发电
工艺工程
工程类
计算机科学
废物管理
电气工程
数学
操作系统
作者
Xiaoqing Li,Lizhi Zhang,Ruiqi Wang,Bo Sun,Weijian Xie
标识
DOI:10.1109/tia.2022.3217229
摘要
Biogas-solar-wind integrated energy systems are effective for optimizing rural energy consumption and improving agricultural production. The performance of an integrated energy system generally depends on its capacity configuration. However, the uncertainties of renewable energy sources and loads deepen the coupling relationship between the capacity configuration and energy dispatching of integrated energy systems, which makes optimizing the capacity difficult. We propose a two-stage robust optimization model for the capacity configuration of a biogas-solar-wind integrated energy system that is applicable to rural areas. First, a framework of the biogas-solar-wind integrated energy system was designed and diverse evaluation indices were introduced. Then, the integrated energy system model was transformed into a two-stage robust optimization problem, where the column-and-constraint generation algorithm is used to solve the installed capacity problem of the system equipment in the first stage, and the nested column-and-constraint generation algorithm is used to optimize the energy dispatching schedule in the second stage. Finally, the proposed model was applied to a rural area in China to confirm the rationality and effectiveness of the optimization results.
科研通智能强力驱动
Strongly Powered by AbleSci AI