Ahmed Gondia,Ahmad S. Siam,Wael W. El-Dakhakhni,Ayman Hamdy Nassar
出处
期刊:Journal of the Construction Division and Management
[American Society of Civil Engineers]
日期:2019-10-28
卷期号:146 (1)
被引量:374
标识
DOI:10.1061/(asce)co.1943-7862.0001736
摘要
Projects delays are among the most pressing challenges faced by the construction sector attributed to the sector’s complexity and its inherent delay risk sources’ interdependence. Machine learning offers an ideal set of techniques capable of tackling such complex systems; however, adopting such techniques within the construction sector remains at an early stage. The goal of this study was to identify and develop machine learning models in order to facilitate accurate project delay risk analysis and prediction using objective data sources. As such, relevant delay risk sources and factors were first identified, and a multivariate data set of previous projects’ time performance and delay-inducing risk sources was then compiled. Subsequently, the complexity and interdependence of the system was uncovered through an exploratory data analysis. Accordingly, two suitable machine learning models, utilizing decision tree and naïve Bayesian classification algorithms, were identified and trained using the data set for predicting project delay extents. Finally, the predictive performances of both models were evaluated through cross validation tests, and the models were further compared using machine-learning-relevant performance indices. The evaluation results indicated that the naïve Bayesian model provides a better predictive performance for the data set examined. Ultimately, the work presented herein harnesses the power of machine learning to facilitate evidence-based decision making, while inherent risk factors are active, interdependent, and dynamic, thus empowering proactive project risk management strategies.
科研通智能强力驱动
Strongly Powered by AbleSci AI