摘要

Abstract A major pipeline company was tasked with decommissioning the Morpeth tension leg platform (TLP) in the Gulf of Mexico (GoM) and needed to abandon a 22-year-old, 8-in gas export steel catenary riser (SCR). The conventional approach to decommissioning an SCR is to mobilize a topside winch package, which sometimes requires the removal of platform equipment. The next step is to carry out structural engineering checks on the platform, determine the wire's various drop point routes through the platform, and provide the engineering analysis necessary to handshake the load from the winch to a heavy lift vessel for abandonment. This was the original plan for the Morpeth TLP SCR decommissioning program. Instead of employing this traditional approach to remove the riser using a topside winch package and heavy lift vessel, the pipeline owner requested an alternative method that had been used previously for an international operator. This novel method employed ROVs and divers to install a series of clamps to grip and secure the riser prior to cutting and used a Multiservice Vessel (MSV) to manage the disconnected riser for abandonment on the seafloor. The appeal of this integrated solution is that it does not interfere with the platform's topside operations or equipment layout and can provide potential cost savings. This methodology was used for the first time in the GoM to remove a riser to make space for a new one to be installed. For this installation, a clamp was designed by the operator to sit on the J-lay collar and to support the weight of the riser being removed. The project was modeled in OrcaFlex to determine safety requirements and the service company carried out the riser removal. Following adaptations to accommodate the differences presented by the Morpeth TLP SCR, a similar approach was used in the SCR decommissioning project, with the service company's engineering team designing a combination of a friction and through-pin box clamp, determining their placement, mapping out the role of divers, and defining the necessary vessel movements for each phase of the operation. Following an initial survey to determine the profile of the SCR, the service company created an OrcaFlex model and decommissioning plan that would allow the vessel to safely execute the program. The model allowed the team to incorporate safety factors to ensure that the load of the riser could be managed and that the riser could be handled without jeopardizing the safety of the vessel or creating riser clashing during the process of cutting and swinging the riser away from the TLP. It was determined that a winch wire could be cantilevered off the stern of the vessel to provide overhead access to the riser and clamp connection point. With the clamps properly connected, the riser was severed in a controlled manner by ROVs and then abandoned within the right-of-way (along the pre-approved area) of the pipeline prior to the ends being plugged and covered. In comparing the actual dynamic loads monitored during the operation with a line rider, it was confirmed that the model was within 5% of the expected loads, estimated at 54 metric tons. This paper explains how an unconventional method of SCR decommissioning allowed execution entirely from the MSV without impeding the operator's decommissioning schedule or conflicting with the work of other contractors on the platform to provide substantial cost savings. The solution also can be used to replace existing risers, whether the useful life of the platform exceeds the useful life of the riser and/or in the case where new field development requires a new tie-in. Other deepwater, vessel-based decommissioning solutions include the abandonment and/or recovery of flushed umbilicals and potentially the abandonment of flexible catenary risers. Following successful execution of the SCR decommissioning project, the pipeline company requested a FEED for using this integrated decommissioning solution for additional offshore assets. It was also requested that the clamp design be ROV installable. The study is for a three-year program to abandon five export SCRs on multiple TLPs in the GoM with loads upwards of 350 metric tons. The abandonment method to be employed for the upcoming SCR decommissioning program is the same as the one described in this paper, with execution from a single, standalone MSV.

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
ii完成签到,获得积分10
1秒前
岁月轻狂完成签到,获得积分10
1秒前
2秒前
粗心的从露完成签到,获得积分10
2秒前
成就映秋完成签到,获得积分10
3秒前
3秒前
3秒前
roomvinli完成签到,获得积分10
3秒前
4秒前
传奇3的应助被杙北采纳,获得10
5秒前
sciq完成签到,获得积分10
6秒前
楠楠别难发布了新的文献求助10
7秒前
General发布了新的文献求助10
7秒前
阔达丹亦发布了新的文献求助10
7秒前
7秒前
猴面包树完成签到 ,获得积分10
8秒前
blutte发布了新的文献求助10
8秒前
9秒前
9秒前
wzc发布了新的文献求助10
9秒前
happybobo发布了新的文献求助10
10秒前
科研通AI6.2的应助被LKT采纳,获得10
11秒前
悦耳凤灵的应助被飞快的慕山采纳,获得10
11秒前
可乐完成签到,获得积分10
12秒前
乐乐的应助被地精术士采纳,获得10
12秒前
13秒前
zeng发布了新的文献求助10
13秒前
13秒前
14秒前
bkagyin的应助被冰淇淋红茶采纳,获得10
14秒前
文静外套发布了新的文献求助10
16秒前
17秒前
17秒前
sxp1031发布了新的文献求助10
17秒前
17秒前
17秒前
bkagyin的应助被TJY采纳,获得10
19秒前
MoonShy完成签到,获得积分10
21秒前
lct360完成签到,获得积分10
22秒前
文章仙人发布了新的文献求助10
22秒前
高分求助中
(应助此贴封号)通过应助OA文献获取积分 10000
Rosenblum, Global Change Biology 800
Management and the Arts 510
Production Logging: Theoretical and Interpretive Elements 400
Geschichtliche Grundbegriffe (GGB), Band 5: Pro–Soz 300
Die Religion in Geschichte und Gegenwart (RGG), 4. Auflage, Band 7: R–S 300
Die Religion in Geschichte und Gegenwart (RGG), 4. Auflage, Band 1: A–B 300
热门求助领域 (近24小时)
化学 材料科学 医学 生物 计算机科学 工程类 纳米技术 内科学 物理 有机化学 化学工程 生物化学 复合材料 光电子学 细胞生物学 心理学 量子力学 催化作用 物理化学 电极
热门帖子
关注 科研通微信公众号,转发送积分 7818223
求助须知:如何正确求助?哪些是违规求助? 9346469
关于积分的说明 20536539
捐赠科研通 7410946
什么是DOI,文献DOI怎么找? 3331974
关于科研通互助平台的介绍 2478253
邀请新用户注册赠送积分活动 2351717