联轴节(管道)
计算机科学
控制理论(社会学)
工程类
理论(学习稳定性)
物理
结构工程
材料科学
可靠性(半导体)
控制工程
机械工程
有限元法
瞬态(计算机编程)
作者
İsmail Alayoğlu,Abdurrahman Karamancıoğlu
出处
期刊:
[Elsevier BV]
日期:2026-11-01
标识
DOI:10.1016/j.jrst.2026.10.004
摘要
Purpose: Reduced-headway high-speed train operation is constrained by stale leader information, braking-capability mismatch, jerk-limited brake build-up, and finite-horizon computation. This study assesses the operating boundaries and failure modes of a braking-supervised model predictive control configuration (BS-MPC) for two-train virtual coupling. Methods: BS-MPC combines delayed-state reconstruction, an assumed maximum-braking comparison envelope, a jerk-aware follower stopping requirement, and a one-step supervisory screen with backup braking. It is evaluated against four matched internal comparators under eight declared scenarios using common plant, communication, actuation, and metric definitions. Results: Within the declared simulations, BS-MPC recorded 36.8 s of aggregate braking-margin deficit duration across S1–S7, compared with 309.2–524.4 s for the matched internal comparators. When S8 was included, the corresponding totals were 54.4 s and 371.2–594.4 s, respectively. No model-based deficit was observed in S2, S3, or S7. Uncommunicated emergency braking and braking-capability mismatch remained the dominant failure modes, with minimum margins of −109.89 m and −73.8 m. The worst observed projected-QP 99th-percentile solve time was 1.14 ms on the stated virtualised platform. Conclusions: BS-MPC provides the smallest aggregate deficit among the tested configurations but with more conservative spacing. The results define empirical, scenario-dependent operating boundaries and failure modes rather than safety certification or universal operational headways.
科研通智能强力驱动
Strongly Powered by AbleSci AI