Mountain railway alignment optimization integrating layouts of large‐scale auxiliary construction projects

粒子群优化 计算机科学 Dijkstra算法 过程(计算) 比例(比率) 功能(生物学) 数学优化 算法 最短路径问题 理论计算机科学 数学 进化生物学 生物 操作系统 图形 物理 量子力学
作者
Taoran Song,Hao Pu,Paul Schonfeld,Liang Zhu,Ming Zhang,Jianping Hu,Yuhui Zhou,Zhanjun Xu
出处
期刊:Computer-aided Civil and Infrastructure Engineering [Wiley]
卷期号:38 (4): 433-453 被引量:26
标识
DOI:10.1111/mice.12839
摘要

Abstract Mountain railway alignment design is an important but complex civil engineering problem. To overcome the drastically undulating terrain, long tunnels and high bridges are major structures used along a mountain railway, which poses great challenges for railway design and construction. Unfortunately, despite being studied for many years, the crucial construction factors of complex structures have received slight attention in alignment optimization. In this paper, for the first time, the layout of large‐scale auxiliary construction projects (LACPs), including tunnel shafts and access roads, is incorporated into the alignment design process in order to consider construction practicability and economy. Primarily, an alignment–LACPs concurrent optimization model is built. After defining the comprehensive design variables, the alignment–LACPs total construction cost is formulated as the objective function. Besides, the separate constraints for designing the alignment and LACPs are considered. Also, a construction duration computation is proposed for constraining the alignment–LACPs integration. To solve the model, a four‐step hybrid solution method is developed. Specifically, the alignment is first generated with a particle swarm optimization (PSO). Afterward, a new divide and conquer approach is devised to search for shaft alternatives along the alignment. Then, a customized Dijkstra algorithm is developed to search for complex access roads. Finally, a novel polynomial mechanism for time‐varying acceleration coefficients (TVAC) is designed for PSO to evolve the alignment–LACPs solutions. The above model and methods have been applied to two complex actual mountain railway examples. Their effectiveness is demonstrated through detailed analysis of resulting railway solutions and control experiments with contemporary TVAC‐based methods.

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
decimalpoint完成签到,获得积分10
1秒前
沐雨汐完成签到,获得积分10
9秒前
寥远星空完成签到,获得积分10
11秒前
小松果完成签到,获得积分10
22秒前
xhsz1111完成签到,获得积分10
26秒前
完美梦之完成签到,获得积分10
27秒前
ssnwlp123完成签到,获得积分10
30秒前
满地枫叶完成签到,获得积分10
31秒前
开放飞阳完成签到,获得积分10
32秒前
kiddos3e完成签到,获得积分10
34秒前
37秒前
medmi完成签到,获得积分10
40秒前
祁灵枫完成签到,获得积分10
41秒前
Asumita完成签到,获得积分10
42秒前
Yx发布了新的文献求助10
42秒前
橘子七个七完成签到,获得积分10
42秒前
顺心凝阳完成签到,获得积分10
43秒前
美满的水卉完成签到,获得积分10
45秒前
AL完成签到,获得积分10
47秒前
潜竹完成签到,获得积分10
48秒前
邓大瓜完成签到,获得积分10
48秒前
gulin完成签到,获得积分10
49秒前
花开富贵完成签到,获得积分10
49秒前
油盐不进的四季豆完成签到 ,获得积分10
50秒前
斯文远望完成签到,获得积分10
51秒前
谨慎凝旋完成签到,获得积分10
52秒前
DrPika完成签到,获得积分10
53秒前
mayberichard完成签到,获得积分10
55秒前
自然若发布了新的文献求助10
56秒前
zh4men9完成签到,获得积分10
56秒前
坚强麦片完成签到,获得积分10
57秒前
桃七七完成签到 ,获得积分10
1分钟前
Muth完成签到,获得积分10
1分钟前
靓丽渊思完成签到,获得积分10
1分钟前
鲤鱼安青完成签到 ,获得积分10
1分钟前
典雅青槐完成签到 ,获得积分10
1分钟前
1分钟前
1分钟前
OK应助科研通管家采纳,获得10
1分钟前
勤奋笙完成签到,获得积分10
1分钟前
高分求助中
GL 2 A method for assessing the in-place cleanability of food processing equipment, Fourth Edition, December 2023 3000
Annie Ernaux: De la perte au corps glorieux 600
Writing Systems 500
Understanding Modeling and Simulation of Polymerization Reactions 400
Invited Discussant 63O and 64O 400
A revision of Limenitis helmanni and its related species (Nymphalidae) from Central and South China 400
Direct and Iterative Linear System Solvers 400
热门求助领域 (近24小时)
化学 材料科学 医学 生物 纳米技术 工程类 有机化学 化学工程 生物化学 计算机科学 物理 内科学 复合材料 催化作用 物理化学 光电子学 电极 细胞生物学 基因 无机化学
热门帖子
关注 科研通微信公众号,转发送积分 6825802
求助须知:如何正确求助?哪些是违规求助? 8538125
关于积分的说明 18170537
捐赠科研通 6163000
什么是DOI,文献DOI怎么找? 3034967
关于科研通互助平台的介绍 2016717
邀请新用户注册赠送积分活动 2011927