独创性
利益相关者
能力(人力资源)
结构方程建模
范围(计算机科学)
变化(天文学)
知识管理
业务
价值(数学)
过程管理
计算机科学
心理学
管理
社会心理学
经济
机器学习
程序设计语言
物理
天体物理学
创造力
作者
Sy Tien Do,Viet Thanh Nguyen,Nghia Hoai Nguyen
标识
DOI:10.1108/ecam-01-2022-0066
摘要
Purpose This study aims to examine the mutual influence of causes of variation orders (VOs), claims/disputes (CDs) on project performance (PP) and stakeholder performance (SP). Design/methodology/approach Firstly, this study identifies the VOs, the CDs, criteria for measuring the PP and criteria for measuring the SP. Then, a survey questionnaire is created to collect data from stakeholders in construction projects. Using the factor analysis method, this study discovers the constructs of the VOs, CDs, PP and SP. The relationships among the constructs are then uncovered using a structural equation model. Findings The research findings confirm that the VOs and CDs have a direct effect on the PP, as well as the PP’s effect on SP, whereas the VOs and CDs have no effect on the SP. It is strongly recommended that critical factors such as poor management, construction method change, design/scope problems, uncontrollable objective problems, impediment problems, lack of commitment among parties and lack of experience and competence of parties should be given special attention to improve the SP. Originality/value The results of the study fill the gap in knowledge by examining the mutual influence of the VOs, the CDs, the PP and the SP. Discovering the mutual influence will assist managers in improving the PP and the SP.
科研通智能强力驱动
Strongly Powered by AbleSci AI