工作流程
步伐
移动地图
设施管理
鉴定(生物学)
建筑信息建模
交通基础设施
建筑工程
工程类
计算机科学
运输工程
系统工程
全球定位系统
电信
业务
地理
数据库
运营管理
植物
大地测量学
营销
调度(生产过程)
生物
作者
Federico Foria,Mario Calicchio,Laura Moretti,Giuseppe Loprencipe
出处
期刊:Acta Polytechnica
[CTU Central Library]
日期:2023-05-02
卷期号:63 (2): 111-122
被引量:1
标识
DOI:10.14311/ap.2023.63.0111
摘要
The tunnel industry has started focusing on the maintenance and management challenges of an existing infrastructure. It is an urgent matter in industrialised countries, where the stakeholders’ attention is increasing at a fast pace considering the incidents and the disruptions caused by improper monitoring and maintenance. This paper presents an innovative methodology to survey and inspect existing railway tunnels through multi-dimensional mobile mapping systems. The proposed approach belongs to the digital strategies for infrastructure maintenance. An integrated multidimensional survey system (ARCHITA) allows for collecting information necessary for the diagnostics of a structure with non-destructive tests. Linear cameras, thermographic cameras, and ground-penetrating radars acquire data to be digitalised and manipulated in different IT environments. The results, in terms of the collected data on structural defects, allow for a new approach for the Management and Identification of the Risk for Existing Tunnels (MIRET). The innovative approach aims at a smart integration of information and models for the Facility Management of the transport system. The workflow for the digitalisation and diagnosis from mobile mapping data has been implemented on two 40km-long metro tunnels.
科研通智能强力驱动
Strongly Powered by AbleSci AI