建筑信息建模
控制(管理)
工程类
建筑工程
成本控制
风险分析(工程)
系统工程
建筑工程
计算机科学
运营管理
业务
人工智能
调度(生产过程)
作者
Hao Kai Zheng,Jian Wen Cao
标识
DOI:10.4028/www.scientific.net/amm.357-360.2533
摘要
The phenomenon of budgetoverruns is common in the construction projects. The lack of overall projectinformation is the important reasons of causing budget overruns. BIM, as a kindof highly integrated information model, will play a positive role in thebuilding life-cycle cost control. This paper points out the disadvantages oftraditional cost control method, introduces the influence of BIM on costcontrol in different stages of building life-cycle, and briefly describes the present situation and futuredevelopment of BIM.
科研通智能强力驱动
Strongly Powered by AbleSci AI