This paper introduces the basic situations of the natural icing station on Xufeng Mountain built by the state key laboratory of power transmission equipment & system security and new technology of Chongqing University, and explains the implementation methods of icing/de-icing at this station in a detail way. It is proved that this icing/de-icing method is feasible after over 3 years operation. The icing type and shape under natural environment is related to ambient parameters, conductor types, and distance between conductors and ground; the ice melting time under natural environment is determined by de-icing current, conductor types and environment factors. The research achievements can provide the power system with technology supply for keeping from icing disasters and lowering loss.