Application of Lean Six Sigma in Construction Project Management: Reducing Delays and Cost Overruns

地铁列车时刻表 运营管理 六西格玛 利益相关者 工程类 挣值管理 业务 价值流映射 综合项目交付 精益六西格玛 估计 项目管理 透明度(行为) 成本估算 建筑业 成本超支 规划师 运输工程 跑道 精益项目管理 价值(数学) 项目组 总成本
作者
Joy Kizito Aryan,Shehab Aldeen Mohammed Mohsen Albaadani,Dagmawi Girma Gebre,Bernard Sasu Boateng,Ayomide David Olalekan
出处
期刊:Journal of Engineering Research and Reports [Sciencedomain International]
卷期号:27 (11): 245-261
标识
DOI:10.9734/jerr/2025/v27i111698
摘要

This paper assesses how Lean Six Sigma (LSS) approaches reduce the delays, cost increase and optimise the workflow and stakeholder coordination in construction projects. An integrative and systematic review has been utilised for transparency and methodological rigour. Following the screening of 321 studies in four major academic databases, 49 peer-reviewed articles published only in 2014 to 2025 were selected to be included in the final synthesis. These researchers found results of construction situations in different parts of the world where construction was done covering commercial, infrastructural and residential constructions. Before intervention, the projects were experiencing average cost overruns of 18 per cent and delays of 22 per cent. Lean tools, including Value Stream Mapping (VSM), Last Planner System (LPS), 5S, Just-in-Time (JIT) delivery, and Kaizen, along with the use of the Six Sigma framework, DMAIC, significantly enhanced the results of project outcomes. Delays were reduced to 7 per cent and cost overruns were reduced to 6% which constituted improvements of 68 per cent and 66 per cent, respectively. Case studies also proved the efficiency of LSS. A commercial project in the United States not only decreased schedule variance by 30 per cent, but also a highway project in India decreased material costs by 20 per cent, and a housing project in Malaysia decreased defects by 40 per cent. LSS helped to decrease the non-value-added activities by 40 per cent, labour productivity, and the level of stakeholder satisfaction by 30 per cent as well. Irrespective of these developments, some problems include cultural resistance, lack of training and quality of data. Having firm leadership, lifelong learning, and strategic digital implementation are the key success factors to maintaining the LSS advantages in construction management. The results show that Lean Six Sigma may be a useful model in the reduction of inefficiencies, which provide relevant suggestions that can be used by project managers to improve time and cost management of construction projects.
最长约 10秒,即可获得该文献文件

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
xiaoze完成签到,获得积分10
1秒前
1秒前
LELE完成签到 ,获得积分0
1秒前
2秒前
3秒前
kiko完成签到,获得积分10
5秒前
6秒前
斯文败类的应助被研友_LjDgxZ采纳,获得10
7秒前
Ben发布了新的文献求助10
7秒前
科研通AI6.4的应助被房产中介采纳,获得10
9秒前
动听的寄松完成签到 ,获得积分10
10秒前
10秒前
12秒前
ML完成签到,获得积分10
13秒前
aaaa的应助被李春生采纳,获得20
13秒前
13秒前
贺贺完成签到,获得积分10
15秒前
mafumafu发布了新的文献求助10
15秒前
搞怪的凡梦完成签到,获得积分10
17秒前
桐桐的应助被楠楠别难采纳,获得10
17秒前
17秒前
19秒前
彭于晏的应助被wuyongxiang采纳,获得10
19秒前
ding的应助被科研通管家采纳,获得10
21秒前
zxy的应助被科研通管家采纳,获得10
22秒前
22秒前
22秒前
丘比特的应助被科研通管家采纳,获得10
22秒前
orixero的应助被科研通管家采纳,获得10
22秒前
隐形曼青的应助被科研通管家采纳,获得10
22秒前
乐乐的应助被科研通管家采纳,获得10
22秒前
共享精神的应助被科研通管家采纳,获得10
22秒前
慕青的应助被科研通管家采纳,获得10
22秒前
初景发布了新的文献求助10
22秒前
CodeCraft的应助被科研通管家采纳,获得10
23秒前
科研通AI2S的应助被科研通管家采纳,获得10
23秒前
bkagyin的应助被科研通管家采纳,获得10
23秒前
23秒前
23秒前
23秒前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
自動車の空力技術 800
Essentials of Carbohydrate Chemistry and Biochemistry, 4th Edition 800
Organizational Behavior 510
Management and the Arts 510
Matrix Methods in Data Mining and Pattern Recognition Second Edition 510
Issues in Task-Based Language Teaching 500
热门求助领域 (近24小时)
化学 材料科学 医学 生物 纳米技术 计算机科学 化学工程 工程类 有机化学 物理 复合材料 生物化学 内科学 细胞生物学 基因 遗传学 免疫学 冶金 光电子学 癌症研究
热门帖子
关注 科研通微信公众号,转发送积分 7783600
求助须知:如何正确求助?哪些是违规求助? 9322921
关于积分的说明 20392195
捐赠科研通 7372251
什么是DOI,文献DOI怎么找? 3320703
关于科研通互助平台的介绍 2468728
邀请新用户注册赠送积分活动 2336951