The highest tested tower of SGCC UHV Transmission Tower Test Base is determined to be 140 m,and the tower crane for erecting the tested tower should be attached to the longitudinal reverse loading structure in view point of both economic and security considerations.For this special attachment way,special studies on design calculations of the attachment pattern,crane adhesion force,attached point calculation to loading structure etc.will be required.