拖延
数学优化
整数规划
调度(生产过程)
二次规划
二次方程
作业车间调度
计算机科学
数学
到期日
启发式
线性规划
地铁列车时刻表
几何学
操作系统
作者
Bahram Alidaee,Gary Kochenberger,Ahmad Ahmadian
标识
DOI:10.1080/00207729408928968
摘要
Abstract Two scheduling problems are considered: (1) scheduling n jobs non-preemptively on a single machine to minimize total weighted earliness and tardiness (WET); (2) scheduling n jobs non-preemptively on two parallel identical processors to minimize weighted mean flow time. In the second problem, a pre-ordering of the jobs is assumed that must be satisfied for any set of jobs scheduled on each specific machine. Both problems are known to be NP-complete. A 0-1 quadratic assignment formulation of the problems is presented. An equivalent 0-1 mixed integer linear programming approach for the problems are considered and a numerical example is given. The formulations presented enable one to use optimal and heuristic available algorithms of 0-1 quadratic assignment for the problems considered here.
科研通智能强力驱动
Strongly Powered by AbleSci AI