Lift(数据挖掘)
地铁列车时刻表
计算机科学
算法
工程类
实时计算
数学优化
数学
机器学习
操作系统
作者
Zhong Xiu Yang,Xiao Bo Ren,Jia Song,Wanliang Wang
出处
期刊:Applied Mechanics and Materials
[Trans Tech Publications, Ltd.]
日期:2011-10-01
卷期号:109: 523-527
被引量:2
标识
DOI:10.4028/www.scientific.net/amm.109.523
摘要
This paper studied the schedule of lift-sliding stereo garages and proposed an effective schedule based on A* algorithm. The results show that the run time of the schedule based on A* algorithm is almost close to 0. It could effectively work in lift-sliding garages and is better than those full search methods such as simple depth-first search and so on. It solves some problems that exist in the management of stereo garages.
科研通智能强力驱动
Strongly Powered by AbleSci AI