座舱增压
水力压裂
石油工程
笼状水合物
海底管道
致密气
地质学
断裂(地质)
天然气
水合物
生产率
生产(经济)
环境科学
岩石学
图层(电子)
采出水
底水
岩土工程
天然气田
保水性
储层模拟
含水率
作者
Chuangji Feng,Sai Wang,Guangrong Jin,Zheng Su,Haizhen Zhai,Weifeng Sun,Li Liu,Yu Cao,Haiyun Ma,Fatma Yehia,Lihua Liu
出处
期刊:Energy & Fuels
[American Chemical Society]
日期:2025-09-25
卷期号:39 (40): 19223-19239
被引量:1
标识
DOI:10.1021/acs.energyfuels.5c03283
摘要
The gas production rates of recent hydrate production tests remain below the commercially viable threshold. To enhance the gas rate, a combined method of hydraulic fracturing and depressurization was proposed for a reservoir containing hydrate and free gas layers. The model was initially validated against the gas production rate from the second offshore Shenhu production test in the South China Sea. Subsequently, the production rate by hydraulic fracturing and depressurization in a horizontal well was investigated. Results indicate that horizontal well deployment in the three-phase layer (TPL, including hydrate, gas, and water) achieves the highest gas rate, while a similar gas rate is observed for the free gas layer (FGL), and the least rate is observed for the hydrate-bearing layer (HBL). The fracture significantly boosts the gas and water production rates, especially in the early stage. However, similar gas rates are observed later for TPL and FGL due to the presence of a band of free gas flow. The well deployment in the TPL is the optimal option because of low water production, whether fractures are present or not. A vertical fracture has a less significant impact on enhancing gas and water production compared with that of a horizontal fracture. The influence of fracture length and number is negligible for wells in the TPL but considerable in the HBL. Implementation of fracturing technology could reduce the number of required horizontal wells by over 33%. This methodology is pivotal for the commercial exploitation of the hydrate reservoirs.
科研通智能强力驱动
Strongly Powered by AbleSci AI