污水
污水
污水处理
活性污泥
环境科学
废物管理
人口
环境工程
废水
反硝化
滴滤器
水资源管理
工程类
化学
医学
环境卫生
氮气
有机化学
标识
DOI:10.2166/wst.1992.0480
摘要
The Emschergenossenschaft plans to improve the Emscher drainage system by separating sewage and clean water. 6 or 7 subcatchment areas will be created and served by separate wastewater treatment plants. The Bottrop WWTP has been planned for 1.3 million population equivalents. It is scheduled to start operation in 1995 and its costs are estimated as totalling 820 million DM in total. Biological treatment will be effected by a low-loaded, single-stage activated sludge system with cascade denitrification and modified UCT process.
科研通智能强力驱动
Strongly Powered by AbleSci AI