Analysis of Riser Gas Pressure from Full-Scale Gas-in-Riser Experiments with Instrumentation

海底 井控 钻井隔水管 石油工程 海洋工程 深水钻井 钻探 钻机 工程类 井口 机械工程
作者
Mahendra Kunju,Mauricio A. Almeida
出处
期刊:SPE drilling & completion [Society of Petroleum Engineers]
卷期号:38 (02): 170-186 被引量:5
标识
DOI:10.2118/206389-pa
摘要

Summary Because the use of adaptive drilling processes, such as managed pressure drilling (MPD), facilitate drilling of otherwise nondrillable wells with faster corrective action, the drilling industry should include the effect of gas dispersion, bubble suspension, fluid compressibility, and riser ballooning to avoid the overestimation of riser pressure and to produce more efficient well control methods. The IADC Deepwater Well Control Guideline recommends always addressing riser gas first, before proceeding to control the well in a well control situation. The intent is to remove the risk of gas reaching the surface and the rig floor, putting personnel and assets at risk. However, with the availability of equipment on the rig dedicated to handling riser gas and the fact that the riser is isolated from the wellbore, the atmosphere reduces the level of risk of gas in the riser, whereas the well below the subsea blowout preventer (SSBOP) poses a greater risk. In this paper, we discuss the results from full-scale experiments recently conducted in an extensively instrumented test well (LSU Well-2) and demonstrate that the riser pressures resulting from upward transport or aggregation of riser gas are much lower than the values estimated using the single-bubble model and industry thumb rules. We explain the danger of using an open-top riser top during the monitoring of gas-in-riser and how the situation can get out of control due to the potential dynamic unloading situation. Our research also demonstrates the minimal fluid bleedoff volumes required to reduce pressure buildup consequences of free gas migration in a fully closed riser containing low-compressibility liquid. A differential pressure methodology used in this paper for analysis was also used for detecting the presence, position, void fraction, and lead and tail velocity of the gas column in real time during each of the tests to make decisions during the tests. The results from a successful application of the fixed choke constant outflow (FCCO) method as a new method for circulating out gas from the riser by staying within the gas-handling capacity of the existing mud gas separator (MGS) on the rig are presented. This is the industry’s first test of the FCCO method.
最长约 10秒,即可获得该文献文件

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
JamesPei的应助被大脑停工采纳,获得10
刚刚
李健的应助被yuxin采纳,获得10
刚刚
1秒前
我看看怎么个事的应助被aaa采纳,获得30
2秒前
Akim的应助被哦呦看灰机采纳,获得10
2秒前
2秒前
2秒前
曾经二娘发布了新的文献求助10
2秒前
3秒前
3秒前
充电宝的应助被ming采纳,获得10
3秒前
优秀的冬衣的应助被natureking采纳,获得10
3秒前
熊小猫完成签到,获得积分10
3秒前
yyyy发布了新的文献求助10
3秒前
快乐再出发完成签到,获得积分10
3秒前
3秒前
4秒前
4秒前
4秒前
4秒前
5秒前
5秒前
xing_xing的应助被开心的芮采纳,获得20
5秒前
6秒前
草果发布了新的文献求助10
6秒前
研友_VZG7GZ的应助被阿旺采纳,获得10
6秒前
6秒前
6秒前
狂野盼雁发布了新的文献求助10
6秒前
情怀的应助被粒粒采纳,获得10
7秒前
丁真珍珠完成签到,获得积分10
7秒前
安宇发布了新的文献求助10
7秒前
wang完成签到,获得积分20
7秒前
7秒前
小马甲的应助被Xhn采纳,获得10
7秒前
一块地发布了新的文献求助10
8秒前
香蕉觅云的应助被bobo采纳,获得20
8秒前
8秒前
核桃发布了新的文献求助30
8秒前
8秒前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
Les Mantodea De Guyane 2000
Guidelines for fracture-safe and fatigue-reliable design of steel structures 600
Problems and Solutions for Integer and Combinatorial Optimization: Building Skills in Discrete Optimization 600
Organizational Behavior 510
Atelier, 2nd edition 500
Study of structural arctic steel in a friction pair with ice 500
热门求助领域 (近24小时)
化学 材料科学 医学 生物 纳米技术 计算机科学 工程类 有机化学 化学工程 生物化学 物理 复合材料 内科学 催化作用 光电子学 人工智能 细胞生物学 无机化学 物理化学 数学
热门帖子
关注 科研通微信公众号,转发送积分 7995142
求助须知:如何正确求助?哪些是违规求助? 9449922
关于积分的说明 21127373
捐赠科研通 7568589
什么是DOI,文献DOI怎么找? 3379604
关于科研通互助平台的介绍 2513197
邀请新用户注册赠送积分活动 2413424