Ultra-high embankments constructed during reconstruction and widening projects are particularly susceptible to excessive and differential settlement, posing significant challenges to construction safety and long-term performance. This study investigates the construction-stage settlement behavior of 22.7 m high embankment through full-section field monitoring using a self-developed settlement measurement system, combined with finite element analysis in PLAXIS 2D. Continuous settlement profiles reveal that deformation is strongly concentrated within the newly filled subgrade core, where maximum settlement reaches up to 9.25 times that observed at the slope surface at the same elevation. Settlement develops predominantly during the early and middle filling stages, governed by fill-induced stress accumulation, while rainfall acts as a transient accelerator of settlement rates; a single prolonged rainfall event induces approximately 1.7 mm of additional settlement. Based on monitored data, an exponential relationship between settlement and fill height is established, with settlement growth rates gradually diminishing as fill height increases. Rainfall effects were not explicitly simulated in the numerical model; instead, rainfall-induced settlement increments were isolated from monitoring records and treated as transient disturbances, enabling identification of the underlying fill-height–settlement relationship. Although the fitted coefficients are project-dependent, the exponential form is governed by stress accumulation and consolidation mechanisms, suggesting transferability to other high-fill widening projects with similar construction sequences.
科研通智能强力驱动
Strongly Powered by AbleSci AI