Research on Layout Optimization of Furniture Workshop Based on SLP
计算机科学
工程制图
建筑工程
工程类
作者
Linge Li,Zhipeng Wang
出处
期刊:Frontiers in business, economics and management日期:2025-05-12卷期号:19 (2): 66-75
标识
DOI:10.54097/ej5h2g44
摘要
The reasonable layout of the production workshop not only helps to improve the handling efficiency of the workshop materials, but also can effectively reduce production waste and improve production efficiency. By analyzing the current situation and existing problems of the production workshop layout of a furniture factory, SLP method was used to evaluate and optimize the overall layout of the production workshop, and the optimization results were analyzed. The results show that there are still some problems in the layout of the furniture workshop, such as unscientific division of working units, repeated work of working units, repeated handling and crossing of handling routes. Based on the analysis of the logistics relationship, non-logistics relationship, comprehensive relationship and regional position relationship among the units of the furniture workshop, the optimization scheme of the facility layout of the workshop was put forward. Through the optimization of the space layout, the production beat is reduced by 4752.63 seconds, and the daily output can be increased by 13. According to the market price of 680 yuan/price calculation, the company can earn 265,200 yuan more per month.