瓶颈
解算器
计算机科学
尺寸
时间范围
数学优化
供应链
生产(经济)
运筹学
库存控制
路径(计算)
数学
经济
艺术
程序设计语言
视觉艺术
宏观经济学
嵌入式系统
政治学
法学
作者
Hark‐Chin Hwang,Wilco van den Heuvel,Albert Wagelmans
出处
期刊:Informs Journal on Computing
日期:2023-08-17
卷期号:35 (6): 1470-1490
被引量:4
标识
DOI:10.1287/ijoc.2022.0216
摘要
We consider a single-item multilevel lot-sizing problem with a serial structure where one of the levels has an inventory capacity (the bottleneck level). We propose a novel dynamic programming algorithm combining Zangwill’s approach for the uncapacitated problem and the basis-path approach for the production capacitated problem. Under reasonable assumptions on the cost parameters the time complexity of the algorithm is [Formula: see text] with L the number of levels in the supply chain and T the length of the planning horizon. Computational tests show that our algorithm is significantly faster than the commercial solver Cplex applied to a standard formulation and can solve reasonably sized instances up to 48 periods and 12 levels in a few minutes. History: Accepted by Andrea Lodi, Area Editor for Design & Analysis of Algorithms–Discrete. Funding: This work was supported by the National Research Foundation of Korea (NRF) funded by the Ministry of Education [Grant 2014R1A1A2058513].
科研通智能强力驱动
Strongly Powered by AbleSci AI