社会成本
工作(物理)
施工管理
领域(数学)
施工前服务
建筑业
相(物质)
计算机科学
业务
项目管理
风险分析(工程)
运筹学
工程类
经济
建筑工程
土木工程
项目管理三角形
微观经济学
系统工程
数学
机械工程
纯数学
化学
有机化学
作者
Wen‐der Yu,Shao‐Shung Lo
标识
DOI:10.1080/01446190500040281
摘要
Negative impacts of construction works on local traffic, environment and business have been pointed out by previous researchers. However, little work has been conductd on the quantification of such costs. A time-dependent construction social costs (COSCO) model is developed for quantifying the negative impacts that result from construction operations during the field execution phase. The COSCO model is a simplified but practical model that calculates the construction social costs in a conservative way. A roadwork construction project is used to show the applicability of the COSCO model. It is found that the daily social cost was US$18 188-5.52 times the project construction cost. This is a striking illustration of management techniques for mediating the social costs of construction projects.
科研通智能强力驱动
Strongly Powered by AbleSci AI