钙环
整体气化联合循环
吸附剂
碳捕获和储存(时间表)
化学
发电站
化学链燃烧
联合循环
环境科学
工艺工程
废物管理
合成气
功率(物理)
工程类
吸附
热力学
流化床
地质学
气候变化
海洋学
有机化学
氢
物理
电气工程
作者
Yanshuo Li,Changsui Zhao,Q. Ren
标识
DOI:10.1002/ceat.201000384
摘要
Abstract A CO2 capture process for an integrated gasification combined cycle (IGCC) power plant using the calcium looping cycle was proposed. The CO2 capture process using natural and modified limestone was simulated and investigated with the software package Aspen Plus. It incorporated a fresh feed of sorbent to compensate for the decay in CO2 capture activity during long‐term cycles. The sorbent flow ratios have significant effect on the CO2 capture efficiency and net efficiency of the CO2 capture system. The IGCC power plant, using the modified limestone, exhibits higher CO2 capture efficiency than that using the natural limetone at the same sorbent flow ratios. The system net efficiency using the natural and modified limestones achieves 41.7 % and 43.1 %, respectively, at the CO2 capture efficiency of 90 % without the effect of sulfation.
科研通智能强力驱动
Strongly Powered by AbleSci AI