发掘
岩土工程
变形(气象学)
研究对象
流离失所(心理学)
压力(语言学)
跨度(工程)
地质学
隧道施工
垂直位移
工程类
结构工程
心理治疗师
心理学
区域科学
哲学
海洋学
地理
语言学
作者
Libo Ding,Xing Chen,Youchuan Wu,Xiaopeng Wang
出处
期刊:
日期:2021-11-06
卷期号:36: 1452-1456
标识
DOI:10.1109/ichceswidr54323.2021.9656197
摘要
The Argveta exit of No. 2 Tunnel in Georgia is taken as the research object, and the three-dimensional geological numerical analysis model of the tunnel is established. The model simulates the construction condition of full-section tunnel excavation through passivation, and discusses the variation law of stress and displacement caused by excavation. According to the study results, with the construction of the tunnel, the surrounding rock pressure increases gradually, which has a lot to do with the tunnel excavation footage and temporary support time; the deformation of tunnel entrance is greatly affected by tunnel excavation, which has a gradual Increasing trend; for the simultaneous construction of tunnels with different spans, the impact of the excavation of a large-span tunnel on the rock, soil, temporary lining and the secondary lining is greater than the stress and deformation of a small-span tunnel.
科研通智能强力驱动
Strongly Powered by AbleSci AI