Systematic review of construction project delays in Kuwait

质量(理念) 运营管理 业务 建筑业 风险分析(工程) 过程管理 工程类 建筑工程 认识论 哲学
作者
Khaled Alrasheed,Ehab Soliman,Haya Albader
出处
期刊:Maǧallaẗ al-abḥāṯ al-handasiyyaẗ [Elsevier BV]
卷期号:11 (4): 347-355 被引量:16
标识
DOI:10.1016/j.jer.2023.08.009
摘要

Over the past two decades, numerous global studies, including those conducted in Kuwait, have focused on examining and understanding delays in construction projects. These investigations aimed to identify causes of delays and rank them based on their impact on project objectives. In pursuit of this research goal, the present study adopts a systematic approach to analyze construction delays, building on related previous research efforts. The primary objective of this analytical approach was to determine the most significant and influential causes of delays and investigate changes in these causes over the span of two decades, during which measures were taken to address delays. Through comprehensive analyses, the critical delay causes within the Kuwaiti construction industry were identified as: contractor site management incompetence, subcontractor-related challenges, design quality deficiencies, problems arising from the used contract, and supply chain disruptions affecting labor availability and construction materials. Additionally, the body of research on the subject was divided into two distinct groups: studies conducted before and after the year 2010. A comparative examination of the outcomes from these two groups revealed notable enhancement for internal site management delay sources, which involve direct management teams including contractors, supervisors, and owners, whereas the influence of external delay causes increased, primarily attributed to the impact of governmental regulations. To assess the dissimilarities between the results of these two groups, an ANOVA analysis was applied, affirming the presence of statistically significant differences. The study concludes by emphasizing key areas requiring further attention to effectively mitigate the causes of delays in construction projects. Moreover, the proposed analysis procedure holds potential applicability to other countries, serving as a valuable tool to augment the understanding of delay analysis within the construction domain on a broader scale.
最长约 10秒,即可获得该文献文件

科研通智能强力驱动
Strongly Powered by AbleSci AI
更新
PDF的下载单位、IP信息已删除 (2025-6-4)

科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
1秒前
bkagyin应助00采纳,获得10
1秒前
爱学习的孩纸完成签到 ,获得积分10
2秒前
半生瓜完成签到,获得积分10
2秒前
Koalas应助ChenYX采纳,获得20
2秒前
2秒前
orixero应助怡然糖豆采纳,获得10
3秒前
3秒前
LXR发布了新的文献求助10
5秒前
风乍起关注了科研通微信公众号
5秒前
7秒前
7秒前
荔枝发布了新的文献求助100
7秒前
Hello应助北船余音采纳,获得10
9秒前
maodou发布了新的文献求助10
10秒前
asdfrfg发布了新的文献求助10
10秒前
10秒前
LSHDSG完成签到,获得积分10
10秒前
隐形曼青应助靓丽傲玉采纳,获得10
11秒前
勤奋努力完成签到 ,获得积分10
11秒前
我是老大应助LXR采纳,获得30
12秒前
陶醉小笼包完成签到 ,获得积分10
12秒前
13秒前
上官若男应助gwentea采纳,获得30
14秒前
15秒前
clientprogram发布了新的文献求助30
15秒前
方仕航发布了新的文献求助10
15秒前
科研通AI5应助123采纳,获得10
15秒前
852应助pp采纳,获得10
15秒前
无情的白桃完成签到,获得积分10
16秒前
17秒前
风乍起发布了新的文献求助10
17秒前
17秒前
浮游应助第三人称的自己采纳,获得10
18秒前
18秒前
19秒前
20秒前
20秒前
20秒前
maodou完成签到,获得积分10
21秒前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
Pipeline and riser loss of containment 2001 - 2020 (PARLOC 2020) 1000
A Half Century of the Sonogashira Reaction 1000
Artificial Intelligence driven Materials Design 600
Investigation the picking techniques for developing and improving the mechanical harvesting of citrus 500
Phylogenetic study of the order Polydesmida (Myriapoda: Diplopoda) 500
A Manual for the Identification of Plant Seeds and Fruits : Second revised edition 500
热门求助领域 (近24小时)
化学 医学 生物 材料科学 工程类 有机化学 内科学 生物化学 物理 计算机科学 纳米技术 遗传学 基因 复合材料 化学工程 物理化学 病理 催化作用 免疫学 量子力学
热门帖子
关注 科研通微信公众号,转发送积分 5184408
求助须知:如何正确求助?哪些是违规求助? 4370229
关于积分的说明 13609334
捐赠科研通 4222301
什么是DOI,文献DOI怎么找? 2315790
邀请新用户注册赠送积分活动 1314326
关于科研通互助平台的介绍 1263281