深共晶溶剂
锌
共晶体系
材料科学
铜
金属
胶结(地质)
冶金
牙髓(牙)
核化学
浸出(土壤学)
溶解
化学
合金
土壤水分
土壤科学
物理化学
病理
水泥
环境科学
医学
作者
Mehmet Ali Topçu,Aydın Rüşen,Özkan Küçük
标识
DOI:10.1016/j.wasman.2021.07.022
摘要
• Environmentaly friendly solvent was investigated for copper and zinc recovery. • Detailed mineralogical analysis of copper converter slag was performed. • 83% of copper and 51% of zinc recovery was obtained by using deep eutectic solvent. • Activation energies for copper and zinc recovery were calculated by kinetic study. • Iron powder usage was investigated to extract metallic copper from leach solution. Industrial copper slag is among the most important wastes to be evaluated in terms of containing valuable metals and the amount of waste approaching 30 million tons per year. Therefore, in this study, it was aimed to propose a feasible route for copper and zinc recovery from copper converter slag (CCS) by using choline chloride (ChCl) based deep eutectic solvent which is applied on this type of slag for the first time. During the leaching experiments with the pure ChCl-2urea mixture, temperature (25–95 °C), leaching duration (2–72 h), and pulp density (1/10–1/40 g/mL) were selected as the parameters to be investigated for Cu and Zn extraction. After the experimental results, the optimized conditions for the ChCl-2urea leaching process, which gave 89.9% Cu and 65.3% Zn extraction was found at 48 h, 95 °C, 1/20 g/mL pulp density with 600 rpm stirring speed. It is noted that the iron dissolution ratio is very low (max. 4.7%) under the selected conditions. At the end of the iron cementation stage, the total recovery efficiency as a pure metallic copper was 63%. The calculated activation energy for the dissolution of the copper and zinc from CCS is 8.86 kJ mol −1 and 14.48 kJ mol −1 , respectively.
科研通智能强力驱动
Strongly Powered by AbleSci AI