码头
结构工程
滑脱
岩土工程
桥(图论)
山崩
有限元法
基础(证据)
地质学
箱梁
工程类
堆
大梁
医学
考古
内科学
历史
作者
Zhongyang Sun,Wuhao Chen
出处
期刊:Journal of world architecture
[Bio-Byword Scientific Publishing, Pty. Ltd.]
日期:2023-06-26
卷期号:7 (3): 38-45
标识
DOI:10.26689/jwa.v7i3.4856
摘要
Through on-site defect investigation, special inspection, and finite element simulation calculation of a high-speed upper-span (30 + 32 + 30) m prestressed concrete box girder bridge, the overall sliding force of the bridge on the right side of platform 0# is analyzed. In this situation, typical defects such as overall girder slippage, support dislocation, pier column deviation, and pier bottom side cracks have occurred in the overpass. At the same time, combined with simulation calculation analysis, it is interpreted that the 0# and 1# foundation has been damaged at a certain position below the ground line. The occurrence of broken piles has provided a reliable basis for the later reinforcement and maintenance of the bridge and ideas for emergency inspection and analysis of bridges damaged by the same type of landslides.
科研通智能强力驱动
Strongly Powered by AbleSci AI