数学优化
调度(生产过程)
动态优先级调度
动态规划
计算机科学
能量(信号处理)
资源限制
运筹学
工程类
地铁列车时刻表
分布式计算
数学
统计
操作系统
作者
Liangwei Chen,Jingwen Zhang,Zhi Chen,Erik Demeulemeester
标识
DOI:10.1080/00207543.2025.2535516
摘要
This paper addresses renewable energy, the fluctuating characteristics of time-of-use (TOU) tariffs and multi-shift scheduling by proposing a novel model for the resource constrained project scheduling problem with multi-shifts, dual-energy hybrid and TOU (RCPSP-MS-DH-TOU) to minimize total project costs. To achieve this, the study focuses on the coordinated optimization of different energy resources during project scheduling and the strategic allocation of high-energy-consuming tasks to pe riods of lower electricity prices. A mixed-integer linear programming model is devel oped to describe the RCPSP-MS-DH-TOU, with an algorithm called MD3QN-PER introduced to solve it. The MD3QN-PER algorithm combines an exact algorithm with an enhanced multi-step prioritized experience replay dueling double deep Q network, which learns optimal scheduling strategies by training on mixed instances. Additionally, spatial pyramid pooling enhances the model’s generalization capabil ity, enabling it to handle scheduling problems of different scales. The experimental results demonstrate that the proposed algorithm outperforms widely used methods in both effectiveness and efficiency. Specifically, for large-scale problems, the algo rithm effectively balances the quality of the solution and the computation time. The application of the RCPSP-MS-DH-TOU model enables project managers to develop more efficient scheduling plans by considering renewable energy, TOU tariffs and multi-shift scenarios.
科研通智能强力驱动
Strongly Powered by AbleSci AI