Uncertainty is a major issue facing electric utilities in planning and decision making.Modeling uncertainty can be based on two general approaches. The first is a probabilisticapproach where probability distributions for all of the uncertainties are assumed. The secondapproach is called “Unknown but Bounded” in which upper and lower limits on theuncertainties are assumed without probability distributions. Interval mathematics provides atool for the practical implementation and extension of the unknown but bounded concept. Thecalculation of HVDC transmission lines fields is used as an example to illustrate the use ofinterval mathematics. Ground- level electric field values are calculated using the traditionalsingle point numbers as well as interval numbers. Various geometries for monopolar andbipolar dc lines are considered. The values from the two methods are compared to prove thevalidity of interval analysis to, practically, model uncertainties associated with HVDCtransmission lines field analysis. Procedures devised to reduce the width of the resultinginterval bounds either through rearranging the governing expressions or through derivation ofinterval probability are discussed.