Quality in infrastructure projects: concepts and framework for explanatory and exploratory studies

作者
Abukar Warsame
摘要

The performance of the construction industry and its contribution to the welfare of society in comparison to other industries such as the manufacturing industry has lately been the focus of many commissioned reports and academic research publications. The so-called “iron triangle” of time, cost and quality have been the most important metrics of construction project performance, especially for the selection of appropriate procurement methods. The perceived inefficiencies emanate from, among other things, increasing construction costs, conflicts and client dissatisfaction, the fragmented nature of the industry, low competition, cost overruns and delays, and lack of quality improvement. There is observed disparity in increases in housing construction costs and an apparent lack of quality improvement of infrastructure transport projects. In Sweden, metropolitan regions experienced higher construction cost increases, while small regions showed less costs increases during economic booms. In order to address these perceived inefficiencies, numerous strategic and project level decisions that influenced the way that publicly owned properties and projects are procured, constructed, operated, and maintained have been made. The decision to transfer quality-related activities and quality assurance responsibilities from client to contractor approximately 25 years ago is one of the decisions that could have an impact on current quality of infrastructure transport projects. The disparity in increases in construction costs and quality improvement concerns could not only influence the performance of construction projects, but also can affect the way different actors in the sector interact with each other and achieve their divergent objectives. The aim of this study is twofold. First, it tries to explain the observed disparity increases in construction costs between big (metropolitan) and medium/small regions. Second, it attempts to ascertain the extent of quality problems in infrastructure transport projects after the transfer of quality assurance responsibilities, and suggests measures that could improve the quality of infrastructure transport projects. Surveys and interviews were used as a means to collect data concerning both supplier structure in relation to housing construction costs and quality of construction projects. Other empirical data from a secondary source were also used. The first part of the research offers an understanding of the behavior of contractors in specific economic situations, specifically by taking into consideration the long-run relationship between contractors and owners/developers. It ascertains that if contractors/subcontractors display opportunistic behavior during the economic boom, the result will be increased higher construction costs. We utilized transaction cost theory in exploring construction sector structures in an attempt to understand changes in the sector from an efficiency perspective. The analysis can also enrich the current understanding of the governance structure of Swedish construction firms and how they could influence construction costs. As the response from the survey suggests, quality of infrastructure projects has not decreased after the transfer of quality assurance from client to contractor. However, the high number of respondents that indicated quality is the same as before the transfer raises a concern of lack of quality improvement. Respondents have overwhelmingly indicated that the lack of public client competence was one of the contributing factors of quality problems. It is argued that with client competence it is important to build-up through proper knowledge management, incentive systems, and training. Further, the retention of new skilled and experienced workers is an essential element for continuous quality improvement goals and objectives. A second opinion practice from independent experts and committees that focuses on the quality aspect of the projects can be introduced in the provision of infrastructure transport projects. Finally, it is argued that without client competence and a company culture that creates the right incentives, no procurement method can guarantee high quality.

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
刚刚
1秒前
ZZZzzzz完成签到 ,获得积分10
1秒前
枕星河完成签到,获得积分10
1秒前
1秒前
1秒前
冰刀完成签到,获得积分10
1秒前
1秒前
传奇3应助鱼儿采纳,获得20
1秒前
爆米花应助减肥的蕉太狼采纳,获得10
1秒前
标致逍遥发布了新的文献求助10
1秒前
cheng完成签到,获得积分10
2秒前
2秒前
CWC发布了新的文献求助50
2秒前
太吾墨完成签到,获得积分0
2秒前
kw发布了新的文献求助10
3秒前
milly发布了新的文献求助10
3秒前
可以组一辈子乐队吗完成签到,获得积分10
3秒前
4秒前
棕棕发布了新的文献求助10
4秒前
顾矜应助fangfeng采纳,获得10
5秒前
晨辉完成签到,获得积分10
5秒前
5秒前
Meng完成签到,获得积分10
5秒前
Dream完成签到,获得积分10
5秒前
ycw发布了新的文献求助10
5秒前
hxhdh发布了新的文献求助10
6秒前
左右完成签到 ,获得积分10
6秒前
6秒前
7秒前
李子昂完成签到,获得积分10
7秒前
7秒前
隐形曼青应助立刻有yy采纳,获得10
7秒前
7秒前
所所应助芭温行由采纳,获得10
8秒前
卧槽完成签到,获得积分20
8秒前
Lynn发布了新的文献求助10
8秒前
比奇堡完成签到,获得积分10
9秒前
vera发布了新的文献求助10
9秒前
Min完成签到,获得积分10
9秒前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
Autoparametric Resonance in Mechanical Systems 1000
Effects of Two Weeks of Red Light Therapy on Choroidal Thickness and Axial Length in Young Adults 700
Cosmos as Art Object: Studies in Plato's Timaeus and Other Dialogues 600
Management and the Arts 510
Matrix Methods in Data Mining and Pattern Recognition Second Edition 510
the fractional Laplacian 400
热门求助领域 (近24小时)
化学 材料科学 医学 生物 纳米技术 工程类 有机化学 化学工程 生物化学 计算机科学 内科学 物理 复合材料 催化作用 细胞生物学 无机化学 光电子学 物理化学 电极 基因
热门帖子
关注 科研通微信公众号,转发送积分 7668729
求助须知:如何正确求助?哪些是违规求助? 9237113
关于积分的说明 19884837
捐赠科研通 7237888
什么是DOI,文献DOI怎么找? 3284157
关于科研通互助平台的介绍 2442994
邀请新用户注册赠送积分活动 2285870