单位(环理论)
偏爱
中国
环境经济学
成本效益分析
风险分析(工程)
选择(遗传算法)
经济
计算机科学
业务
微观经济学
法学
数学
人工智能
数学教育
生物
生态学
政治学
作者
Xizhe Yan,Dan Tong,Yixuan Zheng,Yang Liu,Shaoqing Chen,Xinying Qin,Chuchu Chen,Ruochong Xu,Jing Cheng,Qinren Shi,Dongsheng Zheng,Kebin He,Qiang Zhang,Yu Lei
标识
DOI:10.1038/s41467-024-46549-5
摘要
A transition away from coal power always maintains a high level of complexity as there are several overlapping considerations such as technical feasibility, economic costs, and environmental and health impacts. Here, we explore the cost-effectiveness uncertainty brought by policy implementation disturbances of different coal power phaseout and new-built strategies (i.e., the disruption of phaseout priority) in China based on a developed unit-level uncertainty assessment framework. We reveal the opportunity and risk of coal transition decisions by employing preference analysis. We find that, the uncertainty of a policy implementation might lead to potential delays in yielding the initial positive annual net benefits. For example, a delay of six years might occur when implementing the prior phaseout practice. A certain level of risk remains in the implementation of the phaseout policy, as not all strategies can guarantee the cumulative positive net benefits from 2018-2060. Since the unit-level heterogeneities shape diverse orientation of the phaseout, the decision-making preferences would remarkably alter the selection of a coal power transition strategy. More strikingly, the cost-effectiveness uncertainty might lead to missed opportunities in identifying an optimal strategy. Our results highlight the importance of minimizing the policy implementation disturbance, which helps mitigate the risk of negative benefits and strengthen the practicality of phaseout decisions.
科研通智能强力驱动
Strongly Powered by AbleSci AI